Browse
Search
Agenda - 01-04-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 01-04-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 3:19:42 PM
Creation date
10/3/2016 11:25:11 AM
Metadata
Fields
Template:
BOCC
Date
1/4/1988
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 I. - <br /> i 030 . <br /> Process Management <br /> The "cluster" STEP system concept of wastewater treatment requires that <br /> the service area establish a governing body to oversee the care and regu- <br /> latory compliance of the system. It will be necessary for the McLennan's <br /> Farm Subdivision to create a homeowners association for the purpose of <br /> maintaining the subdivision's wastewater system. The developer's attorney <br /> will draft special covenants to insure equal representation by all lot <br /> owners. A monthly service charge shall be assessed to cover contract <br /> operation, maintenance and management, as well as any capital expenditures <br /> associated with maintenance repair and regulatory compliance. <br /> Project Implementation <br /> 1 <br /> Under the "cluster" STEP wastewater management system proposed herein, the <br /> 4 developer will install the pressure sewer collection system, extend sewer <br /> service connections to each lot, construct the central effluent processing <br /> 4 and pumping station, and construct the 58,300 sq. ft. LPP drainfield <br /> system. <br /> 4 <br /> The individual on—site septic/pump tank installations will be the respon- <br /> $ sibility of each lot owner. The residential pre—treatment systems will be <br /> installed in accordance with subdivisional standard specifications, <br /> compliance with which will be monitored by the Association's wastewater <br /> system manager and the Orange County Health Department. <br /> 1 <br /> Engineer's Overview Statement <br /> The "cluster" STEP wastewater system has been successfully designed, per- <br /> 4 mitted and constructed by Craig B. Morgan & Associates, P.A. The project <br /> was a 14—lot cluster within First Flight Village in Kill Devil Hills, <br /> 4 North Carolina. The 14 lots were located adjacent to Croatan Sound and <br /> were within 100 feet of designated wetland areas. <br /> The implementation of the STEP system concepts permitted safe development <br /> of lands which were considered to be Areas of Environmental Concern. The <br /> process design and technology application was reviewed by the Dare County <br /> 4 - Health Department, Office of Coastal Area Management (CA4A), U.S. Army <br /> Corps of Engineers and the N.C. Department of Human Resources. <br /> The "cluster" STEP system is specially suited to the project site require- <br /> ments of the McLenanan's Farm Subdivision and should comply with the goals <br /> of the Orange County Planning Board with regard to providing optimum envi- <br /> - ronmental protection within a developing Area of Environmental Concern. <br /> CRAIG B.MORGAN AND ASSOCIATES.P.A., ! <br />
The URL can be used to link to this page
Your browser does not support the video tag.