Browse
Search
Agenda - 01-04-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 01-04-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 3:19:42 PM
Creation date
10/3/2016 11:25:11 AM
Metadata
Fields
Template:
BOCC
Date
1/4/1988
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . <br /> and the White Cross <br /> Orange Rescue Squad to -- <br /> Both the South <br /> Fire Department have indishtrdff Se Department has <br /> Volunteer Fir P an additional <br /> serve the proposed development.will result in <br /> indicated that the develop to service calls. While <br /> d for will be able to handle such <br /> 12.3 manhoffSSneDepartment esponl then developments, could <br /> the Sheri combined with o <br /> service, the demand, . <br /> cause the need for additional manp ower indicated that a starmwater <br /> The Erosion Control officer ed fors the Project. Grading perm is <br /> i <br /> management plan is re4u <br /> be required prior to the start of construction. <br /> Will a lso are summarized <br /> comments from Orange Water & Sewer Authority <br /> as follows: provided to confirm be <br /> 1. Additional information wastewater isposal system is <br /> that the proposed assure its long-term rella- <br /> properly designed and to <br /> This information should include a only <br /> bility• to address soils which are re <br /> site analysis suitable, the depth of the restrictive <br /> "marginally" suitable, above the restrictive <br /> soil <br /> horizon, and the extent of mounding that can be ex- <br /> horizon, <br /> petted ta. occur. rate not <br /> DWASA recommends a lower hydraulic loading and <br /> 2. per square foot per day, m <br /> exceeding 0. 075 gallons P protect <br /> long term <br /> lower pollutant loading rate to <br /> ground and surface water quality• <br /> 3. install a dual, alternating absorption <br /> field system and <br /> rovide an additional undisturbed reserve area in case <br /> _either system fails. <br /> - ate measures to prevent the accidental <br /> Provide adequ wastewater from the proposed facilities <br /> prov <br /> discharge of ground waters. I <br /> into surface and <br /> is the impact of recreational uses of he as=eaon <br /> 5. What of the sail absorption <br /> the long-term suitability <br /> Of surface and ground- <br /> g. Establish appropriate monitoring and be ends that <br /> water. DWASA also reCO= to further pr ter t water . <br /> - - built for stormwater <br /> --- quality. _. inspected <br /> The Proposed system should be constructed and u <br /> 3 7 P P to accep <br /> table standards. Sewer and utility - <br /> according <br /> should be reserved for construction an I4 <br /> easements <br /> maintenance of the system. <br /> - ' - .e.. assurance that disposal of solid wastes fro <br /> 8, <br /> Provide - in facility will �.. <br /> 3 septic tanks and from .procesparty in accordance with, <br /> + carried out by a certified party I <br /> State regulations. I <br /> stem should be periodically. <br /> 9, All components of the system <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.