Orange County NC Website
r <br /> 19. Does the drainfield site offer any recreational uses? <br /> 025 <br /> The drai.nfi.eld site can he utilized for athletic functions, however, <br /> permanent structures are not permitted. The site is restricted to <br /> the homeowners association use. <br /> C. Specifics About Stormwater i`ianager.;ent <br /> 20. What measures will be taken to minimize off-site impacts due to sedi- <br /> mentation and erosion during construction and after the subdivision <br /> is complete? <br /> The site drainage will be consistent with the N.C. Division at :':nv.i-- <br /> ronmental Management regulations for sedimentation and erosion <br /> control. Stormwater runoff from roadside ditches will be channeled <br /> to sedimentation traps and temporary impoundment areas for controlled <br /> release to off-site drainage ways. <br /> After construction, the controlled release structures will remain in <br /> place to provide long-term protection for downstream development. <br /> 21. Who will ultimately be responsible for maintaining the in-place <br /> sedimentation and erosion control system? <br /> We recommend that the wastewater utility or County have jurisdiction <br /> authority over maintenance. We hope the County's watershed manage- <br /> ment plan, currently in development stage, will address this issue <br /> more completely. <br /> CRAIG B. MORGAN AND ASSOCIATES, PA. <br />