Browse
Search
Agenda - 01-04-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 01-04-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 3:19:42 PM
Creation date
10/3/2016 11:25:11 AM
Metadata
Fields
Template:
BOCC
Date
1/4/1988
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O R A N G E C O U N T Y 08 <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date January 4,1988 <br /> Action da <br /> Item jLI — <br /> SUBJECT: PD-2-87 CHANDLER CONCRETE <br /> ( Refer to 11/23/87 agenda packet for background data) <br /> DEPARTMENT: PLANNING PUBLIC HEARING Yes _ x No����� <br /> ATTACHMENT( S) : INFORMATION CONTACT: Eddie Kirk <br /> Draft 11/23/87 Public Hearing Minutes <br /> Planning Board Findings <br /> Draft 12/21/87 Planning Board Minutes <br /> TELEPHONE NUMBERS: <br /> Hillsborough - 732-8181 <br /> Durham - 688-7331 <br /> Mebane - 227-2031 <br /> Chapel Hill - 968-4501 <br /> PURPOSE: Consideration of an application for a proposed Planned <br /> Development-Special Use Permit for Chandler Concrete. <br /> This item was presented at public hearing on November 23, <br /> 1987 . <br /> BACKGROUND : Chandler Concrete Company submitted an application for a PD- <br /> 1 - 1 -3 ( Planned Development- Industrial -3) zoning <br /> classification on 2. 0 acres of property located on the south <br /> side of Old N. C. Highway 10 east of N.C. Highway 86. The <br /> request was subsequently amended from PD- 1- 1-3 to PD- I- 1 -1 <br /> at the public hearing to satisfy the minimum lot area <br /> requirements of the Zoning Ordinance. <br /> The property is currently zoned PD- I- 1 -3 and R-1 <br /> Residential , and is designated Ten-Year Transition and <br /> Commercial Industrial Activity Node in the Land Use Plan. <br /> The request has been made in order to bring an existing <br /> washwater recycling facility and the use of the site for <br /> truck parking into compliance with the Orange County Zoning <br /> Ordinance. <br /> A history of the request is as follows: <br /> 10/10/85 - Chandler Concrete Company was granted a <br /> secondary Land Use Plan amendment, Planned <br /> Development rezoning and Class A Special Use <br /> Permit for 1 . 41 acres of land on N. C. Highway <br /> 10. The request was prompted by State-mandated <br /> requirements to contain runoff from the existing <br /> concrete plant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.