Orange County NC Website
O R A N G E C O U N T Y 08 <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date January 4,1988 <br /> Action da <br /> Item jLI — <br /> SUBJECT: PD-2-87 CHANDLER CONCRETE <br /> ( Refer to 11/23/87 agenda packet for background data) <br /> DEPARTMENT: PLANNING PUBLIC HEARING Yes _ x No����� <br /> ATTACHMENT( S) : INFORMATION CONTACT: Eddie Kirk <br /> Draft 11/23/87 Public Hearing Minutes <br /> Planning Board Findings <br /> Draft 12/21/87 Planning Board Minutes <br /> TELEPHONE NUMBERS: <br /> Hillsborough - 732-8181 <br /> Durham - 688-7331 <br /> Mebane - 227-2031 <br /> Chapel Hill - 968-4501 <br /> PURPOSE: Consideration of an application for a proposed Planned <br /> Development-Special Use Permit for Chandler Concrete. <br /> This item was presented at public hearing on November 23, <br /> 1987 . <br /> BACKGROUND : Chandler Concrete Company submitted an application for a PD- <br /> 1 - 1 -3 ( Planned Development- Industrial -3) zoning <br /> classification on 2. 0 acres of property located on the south <br /> side of Old N. C. Highway 10 east of N.C. Highway 86. The <br /> request was subsequently amended from PD- 1- 1-3 to PD- I- 1 -1 <br /> at the public hearing to satisfy the minimum lot area <br /> requirements of the Zoning Ordinance. <br /> The property is currently zoned PD- I- 1 -3 and R-1 <br /> Residential , and is designated Ten-Year Transition and <br /> Commercial Industrial Activity Node in the Land Use Plan. <br /> The request has been made in order to bring an existing <br /> washwater recycling facility and the use of the site for <br /> truck parking into compliance with the Orange County Zoning <br /> Ordinance. <br /> A history of the request is as follows: <br /> 10/10/85 - Chandler Concrete Company was granted a <br /> secondary Land Use Plan amendment, Planned <br /> Development rezoning and Class A Special Use <br /> Permit for 1 . 41 acres of land on N. C. Highway <br /> 10. The request was prompted by State-mandated <br /> requirements to contain runoff from the existing <br /> concrete plant. <br />