Orange County NC Website
O R A N G E C O U N T Y 195 <br /> BOARD COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date 4aruiary 4„1988_ <br /> Action da <br /> Item f_ <br /> SUBJECT: DRAFT CEDAR GROVE TOWNSHIP LAND USE PLAN <br /> DEPARTMENT: PLANNING PUBLIC HEARING Yes X No <br /> ATTACHMENT( S) : INFORMATION CONTACT: Gene Bell <br /> 10-27-87 Cedar Grove TAC Minutes <br /> Draft 11 -23-87 Public Hearing Minutes <br /> Revised Section on Population and <br /> Land Requirement Projections <br /> Draft 12-21 -87 Planning Board Minutes <br /> TELEPHONE NUMBERS: <br /> Hillsborough - 732-8181 <br /> Durham -- 688-7331 <br /> Mebane - 227-2031 <br /> Chapel Hill - 968-4501 <br /> PURPOSE: Consideration of a proposed amendment to the Orange County <br /> Land Use Plan, Section 3. 6 - Cedar Grove Township. <br /> BACKGROUND : When the Orange County Land Use Plan was adopted in 1981 , a <br /> five year update schedule was specified by the County <br /> Commissioners. The plan update process for Cedar Grove <br /> began officially on July 21 at a TAC meeting wherein the <br /> plan update strategy was presented. This was followed by a <br /> public information meeting on August 11 to present <br /> background data and distribute a questionnaire, a meeting on <br /> October 6 to discuss alternative plans, and a final meeting <br /> on October 27 to present the Draft Plan. <br /> With one major exception, the Draft Plan does not differ <br /> substantially from the 1981 Plan. The major change is the <br /> designation of additional water supply watersheds in the <br /> Township, in particular, the Back Creek and Little River <br /> drainage basins. This increases from 28. 5% to 88% , the <br /> amount of township land area designated water supply <br /> watershed. Township activity nodes and the designation of <br /> the entire township as Agricultural -Residential are <br /> unchanged from 1981 . <br /> The Draft Plan was presented to the Planning Board on <br /> November 16, 1987 as an informational item. Several <br /> concerns were expressed by Board members. Among these were: <br /> ( 1 ) The statement on page 3.6-1 that the "Completion of I- <br /> 40 from Chapel Hill to Hillsborough is unlikely to <br /> cause any significant change in the commuting <br />