Browse
Search
Agenda - 01-04-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 01-04-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 3:19:42 PM
Creation date
10/3/2016 11:25:11 AM
Metadata
Fields
Template:
BOCC
Date
1/4/1988
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
191 Mr. Marvin Collins Page Two December 23 <br /> 1987 <br /> community sewage system by the Health Department <br /> Director or the Division of Environmental Management of <br /> the Department of Natural and Economic Resources , which <br /> ever agency is appropriate . There is , therefore , no <br /> basis in the County subdivision regulations for <br /> requiring that which OWASA recommends with respect to <br /> community based systems . Furthermore, in the absence <br /> of some technical support for OWASA' s recommendations <br /> in the form of Division of Environmental Management <br /> support or in the form of local Health Department <br /> regulation support, there is no factual basis for the <br /> subdivision regulations to include such requirements . <br /> On the other hand, it does seem to me that <br /> on-site waste disposal systems approved by the Orange <br /> County Health Department , including both the primary <br /> drain field and the repair drain fields , could be <br /> I required to remain undisturbed provided that is <br /> i consistent with Orange County Health Department <br /> 1 regulations on that point. <br /> 0 <br /> OWASA' s request that the County require the <br /> Q dedication of public utility easements within the <br /> watershed or the Rural Buffer within or outside of the <br /> watershed seems inconsistent with the County' s <br /> g Comprehensive Plan on this point . I think any such <br /> requirement should wait the rural buffer/watershed <br /> 1 study and amendments to the Plan that occur following <br /> g the conclusion of the watershed study. <br /> a <br /> Ver. I truly yours, <br /> At <br /> `Illtor- E. Gledhill <br /> GEG/lsg <br /> xc: Shirley E. Marsha for t , <br /> Board of County ommissi4 - ,s <br />
The URL can be used to link to this page
Your browser does not support the video tag.