Orange County NC Website
4 <br /> Options and General Information to Assist in Board Discussion <br /> Detention Center with Detention Center <br /> Detention Center Only built, co-located Law with LEC <br /> Enforcement Center infrastructure for <br /> (LEC) future co-location <br /> General Facility Current detention facility Current LEC facility <br /> Information information: information: <br /> Original construction: Constructed/renovation: <br /> 1925 2009 <br /> Capacity: 139 Detainees Estimated Project Cost: <br /> Square Footage: 40,227 $5MM <br /> Area: 1.4 acres Square Footage: <br /> 20,000 <br /> Design Process <br /> Currently <br /> Authorized by yes no no <br /> BOCC <br /> Secure 144 bed facility Detention Center <br /> with "core" infrastructure Detention Center with with prepared <br /> Schematic for 250 bed maximum additional additional site and <br /> Characteristics capacity; approximately estimated 12,000-18,000 infrastructure <br /> 49,500-52,200 square square feet of LEC connections for <br /> feet of Detention Center space future LEC2 <br /> space; 6.8 acre site <br /> Conceptual <br /> Project "First Est. $17.6-$19.9 million2 tbd tbd <br /> Cost"Estimates <br /> 1. Based upon initial conceptual cost estimate provided by Moseley Architects in the fall of 2015, coupled with <br /> adequate contingency funds and a reasonable construction cost inflation factor projecting costs in the summer of <br /> 2016. <br /> 2. Infrastructure contemplated: fine graded and crowned building pad and associated site with appropriate <br /> stormwater management installations and utility connection feeds ("stub-outs")from the constructed facility. <br />