Browse
Search
Agenda - 10-06-2016 - 1 - Detention Center - Update on Project Schedule and Discussion of Potential Scope Expansion to Include Law Enforcement Center-Sheriff's Offices
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 10-06-2016 - Work Session
>
Agenda - 10-06-2016 - 1 - Detention Center - Update on Project Schedule and Discussion of Potential Scope Expansion to Include Law Enforcement Center-Sheriff's Offices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2016 8:21:55 AM
Creation date
10/3/2016 8:14:38 AM
Metadata
Fields
Template:
BOCC
Date
10/6/2016
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 10-06-2016 Work Session
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Options and General Information to Assist in Board Discussion <br /> Detention Center with Detention Center <br /> Detention Center Only built, co-located Law with LEC <br /> Enforcement Center infrastructure for <br /> (LEC) future co-location <br /> General Facility Current detention facility Current LEC facility <br /> Information information: information: <br /> Original construction: Constructed/renovation: <br /> 1925 2009 <br /> Capacity: 139 Detainees Estimated Project Cost: <br /> Square Footage: 40,227 $5MM <br /> Area: 1.4 acres Square Footage: <br /> 20,000 <br /> Design Process <br /> Currently <br /> Authorized by yes no no <br /> BOCC <br /> Secure 144 bed facility Detention Center <br /> with "core" infrastructure Detention Center with with prepared <br /> Schematic for 250 bed maximum additional additional site and <br /> Characteristics capacity; approximately estimated 12,000-18,000 infrastructure <br /> 49,500-52,200 square square feet of LEC connections for <br /> feet of Detention Center space future LEC2 <br /> space; 6.8 acre site <br /> Conceptual <br /> Project "First Est. $17.6-$19.9 million2 tbd tbd <br /> Cost"Estimates <br /> 1. Based upon initial conceptual cost estimate provided by Moseley Architects in the fall of 2015, coupled with <br /> adequate contingency funds and a reasonable construction cost inflation factor projecting costs in the summer of <br /> 2016. <br /> 2. Infrastructure contemplated: fine graded and crowned building pad and associated site with appropriate <br /> stormwater management installations and utility connection feeds ("stub-outs")from the constructed facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.