Browse
Search
Agenda - 03-27-2007-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:20 PM
Creation date
8/28/2008 11:28:57 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Alvin and Lorainne Barnette Page 2 of 1G <br />Address: 104 Glossop Circle <br />City: Carrboro <br />Phone #: 929-6458 <br />Date: 9/26/06-- REVISED 1/22/07 <br />I. MAJOR SYSTEMS <br />A. SUB-AREA CLEANUP & TERMITE TREATMENT <br />1. Chemically treat entire perimeter of house for termite and pest control. <br />Chemical treatment to be done by a licensed te~7nite or pest control <br />company. Contractor to provide owner with written proof and warranty. of <br />treatment. <br />2: Level-off soil to fill low areas, Supply az~d install 6 3ni1 plastic vapor <br />bar7•ier to entire sub-area of house sa as to provide moisture protection. ' <br />B. FOUNDATION <br />L Supply and install one new galvanized culvert-style protector for existing <br />right side foundation vent, complete. Re-secure one existing culvert-style <br />protector over existing foundation vent to restore to proper working order. <br /> <br />C. ROOF & GUTTER <br />1. Remove existing composition slvngle roof cover to sheathing from House, <br />dormer and storage room. Remove two existing attic turbine vents for <br />reinstallation at same locations. Remave approximately 4 l.f. of damaged <br />rake trim on dormer, and replace with new wood trim pruned with oil-base <br />primer. Remove approximately 8 l.f. of fascia on right front of house and <br />replace with new wood fascia pismed with oil-based primer. Replace <br />approximately 40 l.f. of damaged lx6 sheathing on storage room roof. <br />NOTE: After existing roof cover is removed, if fiu-ther damage is <br />discovered the Owner, Contractor and Rehabilitation Specialist will meet <br />to review the work, determine a couxse of action and, if necessary, a cost <br />for any additional work. Replace flashing including all chimney <br />flashing, metal Hosing, vent boots, metal drip edge, etc.. All vents, <br />flashing, and other metal surfaces to blend with color of roof. Reinstall <br />two existing attic turbine vents at same locations. Seal all penetrations <br />tluough roof with waterproof material, inchidilig supply and install new <br />cotulter-flashing an chimney. Supply and install new 25 year (minimum) <br />composition shingle roof cover over 1 S# felt on house, complete. Supply <br />and install new rubber roofing on storage room, including proper <br />
The URL can be used to link to this page
Your browser does not support the video tag.