Browse
Search
Agenda - 03-27-2007-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:20 PM
Creation date
8/28/2008 11:28:57 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
55 <br />MEMOR~duM <br />TO: Housing Rehabilitation Contractors <br />FROM: Orange County Housing and Community Development <br />DATE: November 13, 2006 <br />RE: 109 Roberts Street, Carrboro ^ Edna Taylor <br />Work Writeup --Addendum 2 <br />Listed below' are changes to the General. Construction work wxietup and bid <br />package dated .10/26/06 for the referenced project. All ~ather conditions and <br />descriptions remain the same. Please be reminded that bids will be opened and <br />read aloud an November 16, 2006 at 3:OOP.M. in the Housing and Community <br />Development Depaztment office at 300 W. Tryon Street, Hillsborough, N.C. <br />27278. The changes are as follows: .~ ~. <br />D. PLUMBING <br />2. ~ ~ Delete description and add as follows: <br />Supply and install new concrete pad at rear exterior of house to <br />accarnmodate installation of new pre-fob metal water heater shed. <br />Supply and install new prefab metal water heater shed on new <br />concrete pad. Properly disconnect services to existing gas water <br />heater. Reconfigure existing gas and water lines to accomnaadate <br />relocation of water heater location to new water heater shed. <br />Relocate existing water heater to nevv shed. Supply and install new <br />gas alid plumbing connections to water heater and restore to propex <br />working order. Includes proper venting and new PIT overflow drain <br />line comparible with existing P/T valve, complete. Includes <br />aceonnnodation for new expansion tank as provided in PLUMBING, <br />Item 3. Repair Kitchen floor where water heater was remove to <br />restore to proper working.ordex, including use C)wner-supplied floor <br />cover material to repair floor cover. All work to code.. <br />3. Change description as follows: <br />Expansion tank to be located in crawlspace adjacent to new water <br />heater location. - <br />H:iFlousingReLab~CouutylBradsbuwlGenerulConstrucfion~Addenduml.2-9-QG.doa <br />
The URL can be used to link to this page
Your browser does not support the video tag.