Orange County NC Website
Name: Edna Taylor <br />Address: 109 Roberts Street <br />City: Carrboro <br />Phone #: 929-1767 <br />Date: 10/25/06 <br />GENERAL REPAIRS <br />Page 9 of 11 <br />s~ <br />1. Carefully remove existing attic access panel. Repair existing opening to <br />accommodate .new drop-in access panel at same location. Existing <br />adjacent ceiling material to remain intact. <br />2. Carefully remove existing crown molding -from ceiling/wall joints <br />throughout house. Remaining ceiling and wall materials to remain intact. <br />Supply and install new 1/2" sheetrock over existing ceilings throughout <br />house, Bathroom ceiling to have moishue-resistant sheetrock on ceiling. <br />Supply and install new wood crown mold throughout, large enough to <br />cover where existing was removed. Living Room to have natural wood <br />crown mold, all other rooms to have paint-grade crown mold. Sheetrock <br />to have smooth finish. AlI work to code. <br />K. SITE IMPROVEMENTS <br />1. Remove existing soil from right front cai7ler of Douse to approximately 6" <br />below ~ exterior siding. Area of work extends from ~ right end of font <br />concrete porch slab across front of house to approximately 6' down right <br />side of house for a total of approxunately 14'. For a distance of <br />approximately 5' away fronn front and right side of house, slope sail to <br />provide natural drainage swale around front right corner and away from <br />house. <br />III. BATHROOM <br />1. Remove existing floor cover alzd underlayment to subfloor, existing baseboard <br />to remain intact. NOTE: After existing floor cover and tmderlayment are is <br />removed, if fitrther damage is discovered the Owner, Contractor and <br />Rehabilitation Specialist will meet to review the work, determine a course of <br />action and, if necessary, a cost for any additional work. Prepare subfloor for <br />installation of new loan tuiderla}nnent and vinyl floor cover. Supply and <br />install new %4" luaus underlaytnent properly secured with staples and with a <br />smooth top surface, and prepare far installation of new vinyl floor cover. <br />Supply acid install new vinyl floor cover per Owner selection. Supply and <br />installed new white shoe mold adjacent to existing baseboard. Supply and <br />