Browse
Search
Agenda - 03-27-2007-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:20 PM
Creation date
8/28/2008 11:28:57 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Edna Taylor <br />Address: 109 Roberts Street <br />City: Carrboro <br />Phone #: 929-1767 <br />Date: 10!25!06 <br />Page 4 of 11 <br />penetrations tluough roof with waterproof material. Owner responsible <br />for removing and re-installing TV satellite dish. Style and color of shingle <br />per Owner selection.. Conhactor to .supply owner with written warranty <br />far materials al~d labor. New materials to hatch existing as close as <br />practical. All work to code. <br />2. Supply and install new white pre-painted seamless Ogee style gutters on <br />house, with at least one downspout for each gutter and one downspout for <br />every 30' of ,gutter. Does not include removal of existing gutters and <br />downspouts (See Lead Remediation Specs). Each grade level downspout <br />shall have a splash block. <br />D. PLUMBING <br />1. Supply and install new water service shutoff valve within 3' of rear <br />crawlspace access panel. Supply and install new pressure reducing valve <br />adjacent to uew shutoff valve. Includes all. necessary connections, fittings, <br />complete. All work to code. <br />2. Remove existing P/T drain line. Supply and install new P/T drain line <br />compatible with existing P/T valve and extendu1g to exterior of house. <br />Includes all necessary connections, fittings, complete. Includes re-secure <br />existing vent collar to ceiling. All work to code. <br />3. Supply and install new expansion tank for existing water heater. Tank to <br />be located in crawlspace directly under water heater. Includes all <br />necessary connections, fittings, complete. All work to code. <br />4. Properly disconnect existing plastic plumbing drain lines that comiect to <br />existing cast iron drain fittings. Remove cxistu~g cast iron drain fittings <br />and line to nearest point above grade to accommodate installation of new <br />plastic line and fittings. Supply atld install new plastic drain line and <br />fittlllg5 at same locations and reconnect existing plastic drain Lines to <br />restore to proper working order. Includes ne~v line and fittings to <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.