Orange County NC Website
Name: Edna Taylor <br />Address: 109 Roberts Street <br />City: Carrboro <br />Phone #: 929-1767 <br />Date: 10/25/06 <br />Page 3 of 11 <br />~{-G/ <br />approximately 12' of phunbing supply lines. Disconnection of existing <br />plumbing, electrical or other utilities necessary during course of project <br />such work shall be performed in an efficielit, workmanlike manner so as to <br />keep "dawn time" .and temporary connections to a minimum. Existing <br />HVAC unit and duct to reninain intact, new girder to stop adjacent to each <br />side of existing HVAC unit. Price indicated does not include interior and <br />exterior cosmetic repairs, patching cracks, painting, adjusting doors and <br />windows, repair of siding, phtunbing or electrical. All work to code. <br />3. ,Supply and install treated wood shim material to stabilize the coimeetion <br />between one existing pier and the rear canter wood girder. Supply and <br />install two additional treated wood 2" X 8"s, one on front and one on <br />back, "sistered" onto existing rear center girder to stabilize existing splice. <br />Itlchides 2 X 8 filler installed in splice gap. New 2X8's to be installed <br />with appropriate screws and extend to centerline of each pier supporting <br />this span. <br />. $ <br />4. Remove existing small access panel an rear foundation wall. Remove <br />existing loose brick at bottom of opening and prepare area for installation <br />of new brick. Supply and install two course of new brick set in concrete at <br />same location, to match existing as close as possible. Supply and install <br />new framing of ZX treated wood and new access panel framed and braced <br />with 2 x 4 treated lumber and 3/d" plywood face, galvanized metal hinges, <br />locking hasp and lock complete. <br />C. ROOF & GUTTER <br />1. Remove existing composition shingle roof cover to sheathing. Does not <br />include rake trine, fascia and soffit (See Lead Remediation Specs). NOTE: <br />After existing roof cover is removed, if fit1•ther damage is discovered the <br />Owner, Contractor and Rehabilitation Specialist will meet ~to review the <br />work, determine a course of action and, if necessary, a cost for any <br />additional work. Replace flashing, roof jacks, metal nOS111g, pluLnnbing <br />boots, metal drip edge, counter flashing on chimney, water heater vent, <br />etc.. Repair parge coat on existing chitiuney. All metal edge flashing, <br />nosing and drip edge to be pre-fnnislned white material. Supply and install <br />new 25 year {minimum) composition shiingle roof cover over 1 S# felt, <br />complete. Includes shingle-type ridge ventilation systenn. Seal all <br />