Orange County NC Website
Name: Edna Taylor <br />Address: 109 Roberts Street <br />City: Carrboro <br />Phone #: 929-1767 <br />Date: 10/25/06 <br />I. MAJOR SYSTEMS <br />A. <br />SUB-AREA CLEANUP & TERMITE REPORT/TREATMENT <br />Page 2 of 11 <br />Remove debris from crawlspace to a size small enough to rake, Level-off <br />sail to fill low areas. Supply and install 6 mil plastic vapor barrier <br />throughout entire sub-area of house to provide nnoisture protection. <br />Plastic to be installed as last work item of the project. <br />B. <br />2. Chemically treat entire perimeter of house for termite and pest control. <br />Chemical h•eatment to be. done by a licensed termite or pest control <br />company. Contractor to provide owner with written proof and wai7•anty o£ <br />treatment. <br />FOUNDATION <br />1. Remove loose brick and other materials fiom existing foundation vent <br />locations in left, right and rear foundation walls. Supply and //stall new <br />mortar acid brick to fill exposed void at approximately 17 locations, <br />complete. Include repointing cracks in existing mortar in front Left corner <br />a~sd right rear corner of foundation wall. For the approximately 10 <br />remaining loeatioiis, remove existing brick to accommodate installation of <br />new metal automatic foundation vents. Supply and install approximately <br />10 metal automatic foundation vents, properly secured, complete. New <br />materials to match existing as close as practical. <br />2.. Excavate soil iza crawlspace at nine new locations along rear foundation. <br />wall to acconunodate installation of new concrete 24" x 24" x 12" footings <br />aad 16" x 16" concrete block columns to support new girder within <br />approximately 18" of rear foundation wall. Excess soil from excavation to <br />be spzead evenly tluouglaout crawlspace. Supply and install new 24" x <br />24" x.12" concrete footings and new 16" x 1 G" concrete lilock columns <br />integrated with new concrete footings at these locations, incfiding <br />structural connections to new girder, complete. Any wood blocking to be <br />treated material. Supply and install new triple 2" x 8" x approximately 38. <br />1.~ treated wood girder to stabilize existing floor, including structural <br />coiuiections to existing floor fialuing, complete. .Includes relocating <br /> <br />