Browse
Search
Agenda - 03-27-2007-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:20 PM
Creation date
8/28/2008 11:28:57 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
38 <br />'Name: Edna Taylor <br />Address: 149 Roberts Street <br />.City: Carrboro <br />Phone #: 929-1767 <br />Date: <br />Page 3 of 7 <br />Note: Prior to conducting Lead-Based Paint Abatement activities, all persouuel <br />associated with the project should review and folly understand the requirements of <br />ALL applicable local, state, and federal regulations that may apply to the worksite. <br />I. <br />A. <br />WORKSITE PREPARATION <br />GROUND CONTAINMENT <br />Before exterior conshuction, construct a w <br />timbers ten (14) feet from the house exterior. <br />and/or plastic tape tluee (3) feet on center <br />worksite. Post proper signage ire the work <br />remain posted until clearance is passed. <br />B. <br />C. <br />-rlc site perimeter Cilrb of 2x4 <br />Create an outer barrier of flags <br />and twenty (20) feet from the <br />area. All warning signs must <br /> <br />2. During the period of work on all exterior components attaoli one layer of E- <br />mil polyethylene to the building exterior with fuiriug strips, extending the (10) <br />feet past the work site. Wrap the plastic under the perimeter 2x4's. Change <br />the plastic daily. <br />CLEARANCE EXAMINATION <br />1. After completion of all work that disturbed LBP and any other lead hazard <br />reduction activities, a qualified person shall perfoi~n a clearance examination. <br />Work dishtrbing lead-based paint is not considered complete Luitil clearance is <br />achieved. <br />PRE-CLEAN <br />1. Pre-clean the interior of the unit in all areas that Lead Paint was disturbed. <br />HEPA vacuum all horizontal surfaces, to include all floors, windowsills, <br />ixoughs, baseboards and easuig. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.