Browse
Search
Agenda - 03-27-2007-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:20 PM
Creation date
8/28/2008 11:28:57 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Alvin and Loraipne Barnette ~ Page 3 of 6 <br />Address: 1Q4 Glossop Circle <br />City: Carrboro <br />Phone #: 929-6458 <br />Date: <br />Note: Frior to conducting mold remediation activities, alt personnel associated with the <br />project should review and fully understand the requirements of ALL applicable local, <br />state, and federal regulations that.may apply to the worksite. All work to be done in <br />accordance with the Limited Mold Inspection conducted by Carolina Environmental, <br />Inc. and dated August 24, 2006. <br />I. WORKSITE PREPARATION <br />A. CONTA]Q~IMENT <br />Before construction, supply and install containment bar7iers for the <br />Bathroom, Kitchen and crawlspace using one layer of 6-mil <br />polyethylene securely attached with furring strips. crawlspace <br />containment barrier shall accommodate negative pressure during the <br />course of crawlspace remediation work. Post proper signage in the <br />work area. All warning signs must remain posted until clearance is <br />passed. <br /> <br />2. During the period of remediation work, supply and install air <br />scrubbers intermittently fihroughout the house to help cleanse the air <br />and reduce airborne spore concentrations. Continue to scrub the air <br />for forty-eight {48) hours after the remediation work is complete. <br /> <br />B. CLEANING <br />1. Clean the interior of the unit in all areas that mold was disturbed and <br />prepare the runt far post-remediation verification inspection. HEPA <br />vacuum all ,horizontal surfaces, to include all floors, windowsills, <br />troughs, baseboards and casing. Bag or otherwise containerize (poly- <br />wrap) mold-contaminated debris for disposal offsite. <br />.~ ~. <br />C. POST-REMEDIATION EXAMINATION <br />After completion of all work that disturbed mold and any other mold <br />remediation activities, a qualified person shall perform apost- <br />remediation verification examination. Work disturbing mold- <br />contaminated areas is not considered complete until post-remediation <br />verification examination is complete. <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.