Browse
Search
Agenda - 03-27-2007-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:20 PM
Creation date
8/28/2008 11:28:57 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Narne: Alvin and Lorainne Burette _ Page 4 of 5 ~ 7 <br />Address: 104 Glossop Circle <br />City: Carrboro <br />Phone #: 929-6458 <br />Date: <br />iI. ABATEMENT WORK <br />A. FRONT PORCH <br />1. Provide temporary support for front porch roof curreirtly supported by <br />three existing metal columns. Remove tliree existing column supports <br />from front porch per Lead-based Paint Inspection Report/Risk <br />Assessment dated July 6, 2006. Remove existing handrails from both <br />sides of front steps. Remove existing soffit sheathing panel from front <br />lower soffit to verify underlying stricture. NOTE: After removal <br />work is complete, if further damage is discovered the Owner, <br />Contractor and Rehabilitation Specialist will meet to review the work, <br />determine a course of action and, ifnecessary, a cost for any additional <br />work. Supply acid install new wood soffit sheathing at same location, <br />primed with oil-based primer. Supply and install three new painted <br />white wrought iron column supports at same locations, properly <br />secured and anchored, in a manner to accommodate installation of new <br />wrought iron railing on left end of porch and new wrought iron <br />handrails on left and right sides of front steps, complete. Materials to <br />rniatch existing as close as practical. <br />TOTAL PRICE _ ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.