Browse
Search
Agenda - 03-27-2007-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:20 PM
Creation date
8/28/2008 11:28:57 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
as <br />Naznc: Alvin and Lorainne Barnette Page 1 S of 16 <br />Address: 1 d4 Glossop Circle <br />City: Carrboro <br />Phone #: 929-6458 <br />Date: 9/26/06-- REVISED 1/22/07 <br />.practical, including hardware and doorlrnob, complete. New znatcrials to <br />match existing as close as is practical. <br />VI. HALL <br />1: Fully prepare painted surfaces in Hall ready to receive new paint. Tiicludes <br />patch and repair of sheetrock holes and surface cracks and prime all new <br />or "raw" materials. Paint walls and ceilings with ulterior flat latex finish <br />paint and restore to proper working order. Paint trim, casing, baseboard <br />and shoe mold with interior .latex enamel semi-gloss finish. paint and <br />restore to proper working order. Includes painting casing and trim on <br />Bedroom side of new Bedroom doors. Includes touch-up painting on <br />Bedroom walls adjacent to new Bedroom doors to match existing as close <br />as practical. New Batluoom and Bedroom door panels to be stained and <br />sealed. New materials to match existing as close as practical. Color per <br />Owner selection. <br />VII. LIVING ROOM <br />Fully prepare painted surfaces in Living Room ready to receive new paint. <br />Includes patch and repair of sheehock holes and surface cracks and prime <br />all new or "raw" materials. Paint walls and ceilings with interior flat latex <br />finish paint and restore to proper working order. Paint trim, casing, <br />baseboard and shoe mold with interior latex enamel semi-gloss finish paint <br />and restore to~proper working order. New materials to match existing as <br />close as practical. <br />TOTAL PRICE _ $ <br />
The URL can be used to link to this page
Your browser does not support the video tag.