Browse
Search
Agenda - 03-27-2007-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:20 PM
Creation date
8/28/2008 11:28:57 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a~ <br />Name: Alvin and Loraiiuie Brunette <br />Address: 104 Glossop Circle <br />City: Cai7•baro <br />Phone #: 929-G458 <br />Date: 9/26/06-- REVISED 1/22/07 <br />Page 14 of 16 <br />6. Remove existing water supply lines and faucet for sink. Supply and <br />install water supply lines and faucet for new handicap sink to restore to <br />proper working order. Supply and install new handicap sink at same <br />location, complete. Includes new faucet with handicap lever controls. <br />7. Fully prepare painted surfaces in Bathroom, including walls, ceiling and <br />trim, ready to receive new ~ paint. Includes patch aid repair of sheetrock <br />holes and surface cracks and prime all new or "raw" materials. Pint <br />walls, ceilings, trial, baseboard and shoe mold with interior latex enamel <br />semi-gloss finish pant and restore to proper working order. New <br />Bathroom door to be stained and sealed. New materials to match existing <br />as close as practical. Color per Owner selection. <br />8. Supply and install new .grab bars in tub/shower and at toilet properly <br />anchored in solid substrate. Locations to be designated by owner as close <br />as proper anchoring will allow. <br />IV. .BEDROOM #1 (Left, front comer) <br />1. Remove existing interior Bedroom door, fi•ame, jamb and trim. Supply and <br />install new door, frame, jamb apd trim to match existing as close as is <br />practical, including hardware and doorknob, complete. New materials to <br />match existing as close as is practical. <br />V. BEDROOM #3 (Leal, rear earner) <br /> <br />1. Remove existing interior Bedroom door, frame, jamb and hirn. Supply and <br />install new door, frame, jamb and trun to match existing as close as is <br />practical, includuig hardware and doorknob, complete. New materials to <br />match existing as close as is practical <br />VL BEDROOM #2 (Front, center} <br />Remove existing interior Bedroom door, frame, jamb and trim. Supply and <br />install new door, frame, jamb and trim to match existing as close as is <br />
The URL can be used to link to this page
Your browser does not support the video tag.