Orange County NC Website
Name: <br />Address: <br />City: <br />Phone #: <br />Date: <br />3. <br />Alvin and Lorainne Barnette <br />104 Glossop Circle <br />Carrboro <br />Page 12 of 16 <br />929-6458 <br />9/26/06-- REVISED 1/22/07 <br />Prepare new base cabinet and adjacent wall for installation of <br />approximately 9 l.f. of new formica countertop with izllegrated bullnose <br />and backsplash. Supply and install new formica countertop with <br />integrated bullnose and backsplash, including end caps, complete. <br /> <br />4. Prepare new foz.~nica countertop and base cabinet for installation of new <br />stainless steel drop-in sink. Supply and install new stainless steel, double- <br />bowl drop-in sink, including proper clamps and sealant, complete. <br />5. Remove existing water supply lines from existing shutoff valves and <br />faucet for sink. Supply and install new supply lines and single-handle <br />control faucet far new sink and restore to proper working order. <br />_. _.__. <br />6. Prepare existing subfloor for installation of new luaup plywood <br />underlaytnent. Supply and install new %4" luaiuz underlayment, stapled to <br />subflooz•ing, with a smooth top suuface, and prepare for installation of new <br />vinyl floor cover. Supply and install new wood baseboard on laundry wall <br />and in pantry where existing was removed.. Supply and install new vinyl <br />floor cover per Owner selection, and new wood shoe mold, complete. <br />bicltzdes new metal transition strip at adjacent Living Room floor cover. <br />New materials to match existing as close as practical. <br /> <br />7. Fully prepare painted surfaces in Kitchezi, including walls, ceiling, trim, <br />baseboard and shoe mold ready to .receive new paint. Includes patch and <br />repair of sheetrock holes and surface cracks az~d prime all new or "raw" <br />materials. Paint walls, ceiling, trim, baseboard including new baseboard <br />in Fantzy and shoe mold with interior latex enamel semi-gloss fuzisll paint <br />and restore to proper working order. New materials to match existing as <br />close practical. Color per Owner selection. <br />III. BATHROOM <br />