Browse
Search
Agenda - 03-27-2007-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:20 PM
Creation date
8/28/2008 11:28:57 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nazne: Alvin and Lorainne Burzzette Page 11 of 1G (~ <br />Address: 104 Glossozi Circle <br />City: Carrboro <br />Phone #: 929-6458 <br />Date: 9/26/06- REVISED 1!22/07 <br />on rear and left sides. Landing to extend approxunately 4" into storage <br />room to create surface for threshold of new storage rooza~. door. Ramp to <br />have 36" clear width and extend minizntun 18 l.f. from rear edge of <br />landing straight out toward rear yard and have railings on both sides, with <br />railing posts to be set in concrete, with top of haz~clrail set at 34" above . <br />ramp top surface. Top of landing handrail to be set at 34" above landing <br />top surface. Step fo have 36" clear width measured fiozn rear exterior wall <br />of house and have railing on right side, with top of handrail set at 34" <br />above nose of step. A11 work complete. <br /> <br />4. Remove vines and other growth from exterior siding of house. Trim <br />height of shrub iz1 front of house to 12" below eave. . <br />II. KITCHEN <br />1. Remove existing wall-mounted fan above stove. Prepare wall above <br />existing stove to accommodate installation of new wall cabinet and ducted <br />range hood. Range hood to be ducted through new wall cabinet and <br />existing ceiling through roof to the exterior of the house. Ceiling <br />treatment to be moistened and contained wliere hole is cut far ducting to <br />not spread dust and debris. Supply and install new 30" wide wall cabinet. <br />New cabinet to be installed with top of cabinet flush with Kitchen ceiling. <br />Supply and install new duct chase through inside of new wall cabinet, <br />remaizung space to have shelves. <br />2. Remove existing wall cabinets. Prepare existing wall for installation of <br />ziew base and wall cabviets. Supply and install approximately 91.£ of new <br />base cabinets and approximately 101.f. of new wall cabinets, properly <br />secured with screws anchored into studs, including all necessary hardware, <br />drawer handles and door handles, complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.