Browse
Search
Agenda - 03-27-2007-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:20 PM
Creation date
8/28/2008 11:28:57 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i5 <br />Name: Alvin and Lorailme Barnette Page 8 of 16 <br />Address: 104 Giosson Circle <br />City: Carrboa•o <br />Phone #: 929-6458 - <br />Date: 9/26/06-- REVISED 1/22/07 <br />alunninuin~ threshold and weatherstripping. Includes all hardware, keyed <br />lockset and deadbolt, complete. Where exteriar wood frame, h•im and sill. <br />are exposed, supply and install pre-finished white aluminum coil stock to <br />cover exposed wood components, including wood spacers on existing <br />compatients to create uniform surfaces. <br />3. Supply and install new white pre-finished metal stoi7n door on the rear <br />door, including pneumatic closure and security lock, complete. <br />I. EXTERIOR WINDOWS <br />1. <br />Repair ten {10) existing windows to open, close and lock properly. <br />Includes replace damaged glazing putty, cleaning debris from frames, <br />repaint with interior and exterior semi-gloss latex enamel. Exterior <br />painting includes all wood window components. Interior painting includes <br />all wood window components and interior window trim. Supply and <br />install new full screens on foie (4} windows. Existing screen on <br />Bathroom window to be relocated to Kitchen window. <br />2. Remove existing Bathroom window and frame. Repair opening where <br />Bathroom window was removed to accommodate installation of new wall <br />framing. Supply and install new standard framing to provide wall panel in <br />exposed opening. Framing to accommodate installation of interior water <br />resistant sheetiock flush with existing intei7or wall, R-19 wall insulation, <br />extez7or sheathing, exterior building paper and new white vinyl siding: <br />Includes all necessary transitions, j-chantlel and trim for vinyl siding, <br />complete. <br />J. EXTERIOR GABLES, DORMER, SOFFIT AND FASCIA <br />Supply and install new pre-finished white aluminum coil stock over rake <br />trim and fascia on house, doi7ner and storage room. Finish edges of coil <br />stock to have brake-folded hem. Owner responsible for contacting phone <br />company to relocate phone lines from left gable of house <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.