Browse
Search
Agenda - 03-27-2007-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:20 PM
Creation date
8/28/2008 11:28:57 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nauze: Alvin and Lorainne Barnette. Page 7 of 16 ,~ <br />Address: 104 Glossop Circle <br />City: Carrboro <br />Phone #: 929-6458 . <br />Date: 9/26/06-- REVISED 1/22107 <br />width of existing brick above. Re-sectue and seal metal hood where it <br />meets exterior rear wall of house. <br />3. Supply and install new environmental duct from dryer to exterior of house, <br />including flapper closure, complete. <br />G. INSULATION & WEATHERIZATION <br />1. Supply and install blown-in insulation to achieve R-30 value in entire attic <br />of house, complete. Includes baffles at soffits to provide proper au• flow <br />between attic and vented soffits. <br />_. <br />2. Supply and' install new Batt insulation of R-19 value to entire under-floor <br />of house, complete. <br />3. Supply and install weatherstripping on inside of frame of disappearing <br />attic stairs. <br />H. EXTERIOR DOORS <br />1. Remove existing front stoz~zn door for reinstallation. Remove existing <br />front door and door fiatne and prepare opening for installation of new pre- <br />hung exterior door. Supply and install new pre-hung 6-panel metal <br />insulated exterior door with aluminum tlueshold and weatherstripping. <br />Includes all hardware, keyed Ioclcset and deadbolt, complete. Where <br />exterior wood frame, trim and sill are exposed, supply and install pre- <br />finished white aluminum coil stock to cover exposed wood components, <br />including wood spacers on existing components to create uniform <br />surfaces. Reinstall existing storm door and restore to proper working <br />order. <br />2. Remove existing rear screen door. Remove existing rear door and door <br />frame and prepare opening for installation of new pre-bung exterior door. <br />Supply and install new pre-hung 9-light metal insulated exterior door with <br />
The URL can be used to link to this page
Your browser does not support the video tag.