Browse
Search
Agenda - 03-27-2007-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:20 PM
Creation date
8/28/2008 11:28:57 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Alvin azzd Lorainne Bunlette Page 6 of 16 <br />Address: 104 Glossop Ci_rcLe <br />City: Carrboro <br />Phone #: 929-645 $ <br />Date: 9/26!06- REVISED 1/22/07 <br />13. Supply and install pew wiring and connections to accommodate pew <br />switch GOIltr01 11g11t in attic at Saone lOCat1021. Supply and 'install pew <br />switch control, with new switch to be located iIl crawlspace within 3 l.f. of <br />access door. <br />14. lu Kitchen, supply and install new electrical to accommodate installation <br />of new range hood over existing stove with exhaust fan vented to exterior. <br />Supply and install new ducted range hood, complete. Duct to extend to <br />exterior of house. NOTE: Due to existing stzlictl.ual conditions new range <br />hood will be installed as close as possible to center over stove. <br />15. Supply and install new wiring and connections to maintain existing <br />exterior security light and accommodate new switch control to existing <br />ceiling light izn storage room, new switch control to be located to inside <br />left of storage room door. Supply and install new switch control , <br />complete. <br />16. Remove existing wall light fixture in Bathroom. Repair electrical to <br />accommodate installation of new wall light fixture at same location. <br />Supply and install new incandescent wall light fixture in Bathroom. All <br />work complete and to code. <br />F. MECHANICAL <br />Make adjustments to existing HVAC trurilc line and register boots to <br />accommodate installation of new insulated flexible ducting. Supply and <br />install insulation at existing tnmk line, azld new insulated flexible ducting <br />of minilnuna R-6 rating from think line to register boots. Ilicludes all <br />necessary fittings, connections, sealant, complete. Supply and 'install new <br />registers. Service entire HVAC system to restore to proper worlciiig order. <br /> <br />2. Where main duct passes tluough opening in rear wall of house, supply <br />and rilstall new steel lintel with steel vertical supports on each end, all <br />properly connected to existing brick siding, including mortar packed <br />between steel members and existing brick. Width of new lintel to match <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.