Browse
Search
Agenda - 03-27-2007-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:20 PM
Creation date
8/28/2008 11:28:57 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: <br />Address: <br />City: <br />Phone #: <br />Date: <br />Alvin and Loraizule Buz•zaette ' <br />104 Glossop Circle <br />Page 4 of 16 <br />Carrboro <br />929-6458 <br />9/26/06- REVISED 1/22/07 <br />connections to existing plumbing system, complete. Includes framing and <br />sheetrock to fit new washing machine box, sheetrock blended to existing <br />wall with smooth finish. New materials to match existing as close as <br />practical. <br />4. Supply and install plumbing to accoznznodate new pressure reducing valve <br />and new shut-off valve in crawlspace within 3' of crawlspace access <br />panel. Supply and install new pressure reducing valve azad new shut-off <br />valve, complete. <br />Secure existing hose faucet on front exterior wall to restore to proper <br />working order. Supply and izastall new anti-siphon devices on front and <br />rear hose faucets, complete. <br />E. ELECTRICAL <br />1. Maintain overhead service from street utility pole to house. Properly <br />discozulect and abandon existing elechical service. Remove existing sczb- <br />panel box. Supply and install new 200 AMP electrical service ~to house <br />including new breaker panel, mast, weatherhead, and grounding at same <br />locations, cozaaplete. New mast and meter to be surface-naouzated on <br />exterior of house. Work shall. be performed in an efficient, workmanlike <br />manner so as to keep "down tune" and temporary connections to a <br />zninimuzn. Includes framing azad sheetrock to fit zaew sub-panel box, <br />sheetrock blended to existing wall with smooth fuaish. Cleaza, prep and <br />prime entire wall, alad supply and izastall fiiush interior flat latex paint to <br />match existing as close as practical, complete. Includes new circuits, <br />breakers and proper grounding, complete. Includes proper grounding for <br />existing and new outlets. Circuits and breakers to be clearly identified. <br />2. Separate and add circuits so as to alleviate overloaded circuits. ITVAC, <br />refrigerator, stove, miczowave, washing machine, and water heater to be <br />each on separate circuuts. <br />3. Re-secure existing exterior light fixture at front door to restore to proper <br />working order. <br />
The URL can be used to link to this page
Your browser does not support the video tag.