Browse
Search
Agenda - 03-27-2007-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:20 PM
Creation date
8/28/2008 11:28:57 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: <br />Address: <br />City: <br />Phone #: <br />Date: <br /> <br />D. PLUMBING <br />Alvin and Loraiz~rze Barnette <br />104 Glossop Circle <br />Page 3 of 16 <br />Carrboro <br />929-6458 <br />9/26/06--.REVISED 1/22!0? <br />transition from. composition shingle ozi house, complete. Style and color <br />to match existing as close as practical. Contractor to supply owner with <br />written warranty for materials and Labor. All work to code. <br />2. Supply and install new white pre-painted metal Ogee style gutters on <br />house and storage room with at least one downspout for each gutter and <br />one downspout.for every 30' of gutter. Supply and install new gutter <br />guards on all g~.itters. Each grade level downspout shall have a splash <br />block to divert water away from house, except right rear coiner downspout <br />adjacent to reaz: landing which is to tie-into new French drain pipe. <br />1. Properly disconnect and remove existing cast iron drain line from <br />Batluoom/Kitchen tuiderfloor hub connection to joint adjacent to where <br />line enters soil, including existing vent line through roo£ Supply and <br />install new PVC drain line and vent at same locations, including proper <br />comiection to Bathroom, Kitchen az~zd Laundry drains, proper slope, strap <br />hangers, cleauozit, and connection to remaining cast iron line at sail. <br />Includes repair leak in existing plastic tub drain line and restore to proper <br />warlcing order. <br /> <br />2. Move accumulated loose soil away fion~ existing water heater. Supply <br />and install overflow pipe on existing water heater, to run from PTR valve <br />directly to soil below. Supply and install new expansion talik, including <br />all necessary connections aiid fittings, complete. <br /> <br />I~ <br />3. Prepare existing wall opening and plumbing behind washing machine in <br />Kitchen to accommodate installation of new washing zilachizie box. <br />Supply and install new washing machine box, including tie-in and <br />
The URL can be used to link to this page
Your browser does not support the video tag.