Orange County NC Website
Created By:Max Bushell,Orange <br /> Att 1: SPOT P4.0 Transportation Project Prioritization Process (STIP 2018 — 2027) — TARPO County Transwrtation Planner <br /> MOW Project List Statewide ItWonal Impact Divisi®n Na®ds�' <br /> IDp N.Dd.. ]D%NtaDdw,,M MPO/RPO Input,M DI,1,1,n Input 50%—Drtr 25%MPO/RPO Input,35%DN6bnlnput <br /> June 20 'V <br /> • August/September December \.. <br /> % <br /> NC 54 Operational Improvements PROPOSED LOCAL INPUT POINTS—REGIONAL IMPACT(35)and DIVISION NEEDS(100) NC 54 Operational Improvements <br /> `� (Orange Grove Road-originally 1 (Orange Grove Road-originally <br /> U Dodsons Crossroads-to Old Dodsons Crossroads-to Old <br /> Fayetteville Road) Fayetteville Road) <br /> y�� NC 54 Widening(Orange Grove Road NC 54 Widening(Orange Grove Road Removed from Local Input Scoringt <br /> to Old Fayetteville Road) to Old Fayetteville Road) <br /> Buckhorn Road(SR 1114)Widening: Included as part of the B-G MPO Project List <br /> Q4 Old Greensboro Road Paved Old Greensboro Road Paved <br /> Shoulders <br /> Shoulders <br /> 5 Efland-Cedar Grove Road r' /} Efland-Cedar Grove Road <br /> Improvements: 4! Improvements: <br /> Orange Grove Road/Buckhorn Road r Orange Grove Road/Buckhorn Road <br /> 6 Paved Shoulders PF 5 Paved Shoulders <br /> NC 54 Widening(NC 119 in <br /> Orange Grove Road Paved Shoulders <� From NC 54 to ArthurMinnisRoad �. Not Carried Forward Removed from Local Input Scoria t <br /> ( ) Road)t <br /> ,� <br /> C�54 Orange Gro ve Road <br /> Not Carried FprWard on Improvements <br /> PROPOSED LOCAL INPUT POINTS(100) <br /> �p� Orange Grove Road/Dodsons *Projects in the Division Needs category are scored as low priorities as they are not eligible for funding at the Regional Impact funding level. <br /> iJ Crossroads Not Carried Forward tThe NC 54 widening projects have been removed from scoring in favor of the operational improvements projects,which scored higher and will <br /> solve the problems along the corridor in the interim.Also,a corridor study on NC 54 is programmed,which will provide better data to <br /> determine the best approach to solving(future)congestion issues on the roadway. <br />