Browse
Search
Agenda - 10-04-2016-13-5 - Information Item - State Transportation Improvement Program Regional Impact Funding Tier Project Prioritization
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 10-04-2016 - Regular Mtg.
>
Agenda - 10-04-2016-13-5 - Information Item - State Transportation Improvement Program Regional Impact Funding Tier Project Prioritization
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2016 4:19:49 PM
Creation date
9/29/2016 4:09:40 PM
Metadata
Fields
Template:
BOCC
Date
10/4/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
13-5
Document Relationships
Minutes 10-04-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Created By:Max Bushell,Orange <br /> Att 1: SPOT P4.0 Transportation Project Prioritization Process (STIP 2018 — 2027) — DCHC MPO County Transpirtation Planner <br /> i1nitisl project Ust Statewide Regional Impact Division Needs* <br /> 100 N.Dd— ] NtaDdw,,15%MPO/RPO Input,M Division Input 50%Data Drtr ]5%MPO/RPO Input,35%—mn Input <br /> August/September ® 1 <br /> South Churton Street(Old NC 86 from I- South Churton Street(O1cf--NC86)from I- <br /> 40 to Eno River Improvements 0 to Eno River Improvements <br /> 140 Widening from 1-40/1-85 interchange 1-40 Widening from 1-40/1-85 RECEIVED LOCAL INPUT POINTS(100) <br /> to NC 86 13 interchange to NC 86 <br /> J I-40 Widening from NC 86 to U.S.15-501 414 1-40 Widening from NC 86 to U.S.15-501 <br /> FUNDEDI <br /> 4� I-40 and NC 86 Interchange I-40/NC 86 Interchange Improvements <br /> Improvements '—' <br /> I-85/Old NC 86 SR-1009-South Churton FUNDED! I-85/Old n INC S re t) Interchange <br /> -South <br /> Street)Interchange Improvements lr ✓ Churton Street) Interchange <br /> Improvements <br /> V I-85/NC 86 Interchange Improvements 2 <br /> RECEIVED LOCAL INPUT POINTS(100) <br /> NC 86 Improvements North o �. NC 86 Improvements Nort o <br /> �7 Hillsborough Hillsborough RECEIVED LOCAL INPUT POINTS(25) <br /> Eno Mountain Road/Mayo,Mayo Street at y iy Eno Mountain Road/Mayo Street at <br /> gj Orange Grove Road 11 Orange Grove Road <br /> J U.S.70 East/1-85/1-40 Connector 8 U.S.70 East/I-85/I-40 Connector <br /> ea Road Bike Lanes an Homestea Road Bike Lanes an <br /> 410 Homest Sidewalks 12 Sidewalks <br /> * Eubanks Road Bike Lanes ; Not Carried Forward 9 Exten Orange Grove Road from Orange <br /> RECEIVED LOCAL INPUT POINTS(35) rnvodn I IS 7nA <br /> 12 Mt.Carme Church Road Bike/Pedestrian Not Carried Forward Neville Road I RECEIVED LOCAL INPUT POINTS(100) <br /> Improvements provemen <br /> 413 Orange High School Roa Haro Latta Not Carried Forward I-85 rom Mt.Herman Church to <br /> Road Sidewalk Improvements Durham County Line Widening <br /> y 41 Orange Grove Road/1-40 Pedestrian Not Carried Forward 1-85 from 1-85/1-40 Split to east of the NC <br /> Bridge 6 86 Interchange Widening <br /> 515 Dairyland Road Paved Shoulders Not Carried Forward Dimmoc s Mill Road Rail Crossing <br /> Im rovement and Bellvue Street Closure tThis project crosses DCHC MPO and TARPO <br /> Trai Connection from English Hi Lane to NC 54 Operational Improvements(Orange boundaries and is rated as top priority in the TARPO <br /> 5 Buttonwood Drive r.., Not Carried Forward t to Old Fayetteville Road) region.It will receive local input points from both <br /> Tral Connection from Patriot s Pointe to RECEIVED LOCAL INPUT POINTS(65) organizations. <br /> 4 Timbers Drive , Not Carried Forward <br /> *Projects in the Division Needs category are scored as low priorities as they are not eligible for funding at the Regional Impact funding level. <br /> Once the Regional Impact scores are returned from NCDOT in August/September,the projects will be reprioritized. <br />
The URL can be used to link to this page
Your browser does not support the video tag.