Orange County NC Website
. . <br /> 6 <br /> '1Lidar-McludeS shipping 11 21 $3,500,001 $7,000.00 <br /> 2 ;Radar-Includes installation and shipping 21 $2,500.001 $5,000.00 <br /> Total Equipment Cost $12,000.00 <br /> 1.1_. 1 12 Pentax Pocketjet 6 Mobile Printers with power supply $4,200.001 <br /> 1 Total Other Items and Equipment Direct Cost: $24,200.00 <br /> 2 Travel ' - - $1,800.00 <br /> Total Travel Cost: $3,800.00 <br /> TotmDt er Direct Costs $40,000l0 <br /> 1 <br /> -------- -------- - -----------'---- - <br /> 2 <br /> 3 / 1 <br /> 4 <br /> ------- ------- ------' ----------- <br /> Total Indirect Costs <br /> ~zw� <br /> s activities to be performed in each quarter. <br /> Conditions for Law Enforcement Only <br /> By checking this box, the above agency agrees to the terms below as additional activities to be performed as part of this <br /> project. <br /> A minimum of one(1)nighttime and one(1)daytime seat belt initiative per month; <br /> A minimum of one(1)impaired driving checkpoint per month; <br /> • A minimum of 50%of seat belt initiatives must be conducted at night between the hours of 7:00 p.m. and 7:00 a.m.; <br /> Participation in all"Click It or Ticket"and"Booze It&Lose It"campaigns; <br /> Participation in any event or campaign as required by the GHSP; <br /> Attempt to utilize one of the Forensic Tests for Alcohol Branch's Mobile Breath Alcohol Testing (BATMobiles) units <br /> during at least one of the impaired driving checkpoints. <br /> Version 1.0 Page 4 of 5 <br />