Browse
Search
Agenda - 03-27-2007-5e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:29:21 PM
Creation date
8/28/2008 11:27:54 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5e
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br />PHILLIP BARYON <br />Library Design Corzsultarzt <br />714 Brookmont Avenge <br />Salisbury, NC 28146-7293 <br />Telephone/Fax: 704.633.5462 <br />pbarton2 (a,carolina.rr. com <br />PROPOSAL <br />March 19, 2007 <br />Pamela Jones, Director <br />Orange County Purchasing & Central Services <br />129 East King St. <br />Hillsborough, NC 27278 <br />Re: Space Needs Study and Building Program for a new facility to house the library <br />headquarters of the Orange County Public Library <br />Dear Pamela: <br />I am hereby proposing to conduct an abbreviated space needs. study and develop a <br />building program based on that study for a new library headquarters of the Orange <br />County Public Library. This proposal sets forth the services I intend to provide in <br />working on this project and the fee for those services. <br />Since the overall amount of space has already been established, 23,400 square <br />feet, I will prepare an abbreviated space needs study to determine the square footage of <br />each of the library's building components. The study is based on analyses of six common <br />elements of a public library facility -collection space, public seating space, public, <br />computer space, special-use space, meeting/programming space and staff work space. As <br />part of this phase of the work I will also conduct two charettes to solicit public input for <br />the proposed library. <br />The next phase of the project will be the development of a building program for <br />the proposed library facility based on the space needs study. The building program is a <br />narrative description of the proposed library facility, which delineates and describes in <br />detail each area in the building. The architect will use the building program as a guide in <br />designing the desired building. Furthermore, the owners will use the building program to <br />ascertain that the architect is designing a building that meets their specifications. <br />The third phase of work will be to conduct at least two reviews of the architects <br />design in cooperation with the architect. The purpose of these reviews will be to evaluate <br />the translation of the building program into an actual building design. <br />(continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.