Browse
Search
Agenda - 08-18-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 08-18-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2016 11:29:50 AM
Creation date
9/29/2016 3:42:30 PM
Metadata
Fields
Template:
BOCC
Date
8/18/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From this analysis, it is clear that the proposed hydraulic and pollutant <br /> loading rates are much too high for the proposed 8.2 acre absorption field <br /> area. Other public and private parties who design such systems have stated <br /> that a much lower loading rate should be utilized in the design of this <br /> system. Based on discussions with other parties who design these systems, <br /> OWASA recommends that an HLR not exceeding 0.075 gallons per day per square. <br /> foot be utilized in designing the proposed system, provided sufficient <br /> documentation is provided to support that the design loading rate will not <br /> result in contamination problems. <br /> • <br /> 3. The proposal for a backup soil absorption area to be reserved provides only <br /> an "after-the fact" approach to correcting future wastewater disposal <br /> problems. Under that approach, if a failure of the primary system occurred <br /> it would continue while the replacement system was being installed in the <br /> backup field. <br /> A greater degree of reliability and operational flexibility should be <br /> incorporated into this large community system since a failure will create a <br /> major problem. To provide added assurance that the system will have a long, <br /> useful life, the primary soil absorption area should be periodically rested. <br /> This will allow the absorption field to gradually drain, theneby.exposing_ _ <br /> the infiltrative surfaces to the air allowing bacteria to restore the <br /> field's infiltration capability. Periodic resting requires that a second <br /> absorption field exist to allow continued disposal while the first is in the <br /> recuperative phase. The systems can be alternated on a yearly basis <br /> (Reference *1) . This approach is required in Fairfax County, Virginia and <br /> other areas. <br /> OWASA recommends that at a minimum a dual, alternating absorption field <br /> system be required to be installed and utilized for this project. <br /> Additionally, the need for reserving an undisturbed backup area should be <br /> considered in the event either of the dual absorption areas fails. The <br /> combination of a lower hydraulic loading rate and redundant absorption <br /> facilities, together with a good maintenance and operation program should <br /> provide substantially greater reliability of the community waste disposal <br /> system functioning adequately and properly. As recommended in the <br /> literature, this conservative approach is justified "because (1) it is more <br /> difficult to achieve even distribution of effluent in large systems, thus <br /> making localized overloading more likely, (2) groundwater mounding may be a <br /> problem with these large systems, and (3) surface failures of these systems <br /> may present larger environmental and health consequences because of their <br /> size." (Reference #4) <br /> 4. Two "community septic tanks" and pump stations are proposed to be <br /> constructed, one of which is to be located within approximately 250 feet of <br /> Morgan Creek. Adequate measures must be taken to prevent the accidental <br /> discharge of wastewater from these facilities into surface and groundwaters. <br /> It is recommended that: <br /> a. Reserve storage tanks be constructed to store the additional volume of <br /> wastewater which is equal to that which would be received under a <br /> 24-hour peak day period. That would provide backup storage in the event <br /> a pump station failure occurred; <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.