Orange County NC Website
26C <br /> INTEROFFICE MEMORANDUM: 8704-1810 <br /> Water/Sewer Policy <br /> May 13, 1987 <br /> Page 3 <br /> operation and management of package sewage <br /> treatment plants are spec - fled as a requirement to <br /> the permitting process fc,r such facilities . ( LUP) <br /> ( h ) Prohibit package sewage treatment plants in the <br /> areas designated Water Su,.ply Watershed . ( LUP) <br /> ( 1 ) Establish an on-site wastewater treatment <br /> inspection program wi `h, in the portions of water <br /> supply watersheds designated as Water Quality <br /> Critical Areas . ( LUP) <br /> ( J) No permitted use in any district shall discharge <br /> any waste contrary to the provisions of G. S. 130- <br /> 160 . (Z0-6 . 14 . 10) <br /> • <br /> ( k) No permitted principal use, special use or <br /> accessory use shall discharge into the OWASA, <br /> Durham or Hillsborough sewage treatment facilities <br /> any waste that cannot be treated by biological <br /> means . (ZO-6 . 14 . 10 ) <br /> ( I ) Ground absorption systems with a design capacity of <br /> 3, 000 gallons per day or more and package treatment <br /> plants for sanitary sewae disposal are expressly <br /> prohibited in the AR districts and Rural Buffer <br /> districts as shown in the Land Use Plan except as <br /> may be approved through a Special Use Permit or a <br /> Planned Development District. (20-6 . 20) <br /> (4) allfteetion of Weter/5gw'er S @'-'' ce D i s+r i cts <br /> ( a) Provide water and sewer sines in those areas which <br /> can be practically and efficiently served by these <br /> facilities . (LUP) <br /> (b) Develop and implement a cooperative joint planning <br /> process among the County municipalities and those <br /> organizations responsible nor water and sewer lines <br /> to guide the extension of lines in accordance with <br /> the land use plans and policies of the affected <br /> jurisdictions. ( LUP) <br /> ( c) Establish Urban Service Areas for Chapel Hill , <br /> Carrboro, Hillsborough , t-',ebane and DL 'hem which <br /> will correspond with t- e 10-year a- d 20-year <br /> Transition Areas . Water z. ' d sewer lines should be <br /> directed to those areas which contain and are <br /> appropriate for highs- density levels of <br /> residential , commercial and industrial development. <br /> ( LUP) <br />