Orange County NC Website
241 <br /> facilities by the CITY. Failure to provide this information will <br /> result in forfeiture of all rights to refunds which would have <br /> been received according to other provisions of the this Contract. <br /> m. The CITY has adopted a schedule of "Capital Facility <br /> Fees", also called "Impact Fees" to be paid to the CITY for the <br /> privilege of connecting to the CITY 's water system. Nothing in <br /> the Contract shall be construed to change anyone's obligations to <br /> pay these fees. <br /> n. Neither the CITY nor the TOWN will be responsible for the <br /> quantity or pressure of water serving the Project. <br /> o. The CITY may require any testing it deems appropriate to <br /> determine that the work complies with CITY standards and <br /> specifications. All such testing shall be at the TOWN's expense. <br /> p. The words "line" and "lines" shall include "main" or <br /> "mains" unless the context otherwise requires. <br /> 4. The maximum amount of water to be supplied to the TOWN by the <br /> CITY through the subject water main shall be two million gallons <br /> per day (2 MGD) subject to the limitations contained in Paragraph 6 <br /> unless the CITY shall determine that a greater amount of water <br /> can be supplied. The maximum amount of water to be supplied by <br /> the TOWN to the CITY through the subject water main shall be 1 MGD <br /> subject to the limitations contained in Paragraph 11 unless the <br /> TOWN shall determine that a greater amount of water can be <br /> supplied. <br /> 5. Upon written request from the TOWN, and upon determination by <br /> the City that it has adequate water supply capacity from its own <br /> -7- <br />