Orange County NC Website
20 <br /> half the average cost to the TOWN per linear foot of pipeline <br /> installed, whichever is less, multiplied by the frontage of the <br /> property being served. Connections to the line east of the <br /> service area boundary line shall be in accordance with the CITY <br /> OF DURHAM Urban Growth Policy. <br /> k. The TOWN extending the water facilities pursuant to this <br /> Contract shall furnish information as to the actual cost of <br /> construction to the CITY after notice of acceptance of the <br /> facilities by the CITY. Failure to provide this information will <br /> result in forfeiture of all rights to refunds which would have <br /> been received according to other provisions of the this Contract. <br /> 1 . The CITY has adopted a schedule of "Capital Facility <br /> Fees", also called "Impact Fees" ,to be paid to the CITY for the <br /> p ri vi 1 ege of connecting to they CITY ' s=water.- system. Nothing in <br /> the Contract shall be construed to change anyone' s obligations to <br /> pay these fees. <br /> m. Neither_-the-CITY nor the TOWN will - be responsible...for the <br /> quantity, or:° pressure .of- rater serving the Project. <br /> n. The CITY may require any testing it deems appropriate to <br /> determine that the work complies with CITY standards and <br /> specifications. All such testing shall be at the TOWN ' s expense. <br /> o. The words "line" and "lines" shall include "main" or <br /> "mains" unless the context otherwise requires. <br /> 4 . The maximum amount . of.. water to be supplied to the TOWN by the <br /> CITY through the subject water main shall be r2.:O: million_ gallonsr <br /> peerday. subject:•to:,the l imitations = contained in paragraph 6 <br /> unless the • CITY--shall determine that a greater amount of water <br /> can ' be supplied. The maximum amount of water to be supplied by <br />