Browse
Search
Agenda - 06-01-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 06-01-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2016 8:22:24 AM
Creation date
9/29/2016 1:44:27 PM
Metadata
Fields
Template:
BOCC
Date
6/1/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I l) <br /> gravel-paved parking spaces located on each , <br /> indxva�dual 50' x 100' trailer <br /> space. Site distance at the intersection of Mt. Herman Church Road is <br /> excellent - greater than 650' in both directions. <br /> lWater supply will be via a new 15 GPM well and private water <br /> distribution system permitted and approved by the North Carolina Division <br /> Iof Health Services . <br /> The Orange County Health Department has tested the soils and given <br /> preliminary approval of the site for a standard underground septic <br /> disposal system using the low pressure pipe effluent distribution system. <br /> The entire system will be subsurface, to be permitted and approved by the <br /> INorth Carolina Division of Environmental Management. <br /> 1410 Control of stormwater runoff and erosion control for all new <br /> construction will be accomplished using conventional methods. There will <br /> be no significant cutting or filling to prepare Phase 2. Phase 2 is <br /> buffered by existing trees from 1-85 ; within Phase 2 the closest trailer <br /> space is 160' from the right-of-way of 1- <br /> 85 . <br /> Refuse collection will be provided by the Park owner to all <br /> residents. A private trash collection service will be hired to collect <br /> 1 from individual trash receptacles , exactly as the refuse is now collected <br /> in Phase 1 . <br /> This entire site will remain under one ownership including all trailer <br /> Yspaces , recreation space, open space (pasture and woodlands) , roads and <br /> utilities. Under current zoning regulations, no more dwelling units may <br /> be added to this particular tract of land at some future date. <br /> 410 <br /> Attached are exhibits describing development information <br /> project <br /> I location, a notification list and a legal description of the PD-MHP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.