Orange County NC Website
ANION <br /> ; <br />________________________________________311 AR�CT ITM 1O <br /> BOABD <br /> Aa AOED 11981 <br /> TINE CE i <br /> 10ETG Dt% <br /> AT 00GB V° <br /> ***** �`*NO <br /> 20 giTtii OW); FLT ********* PUBt IC * ****�`** 5 <br /> Su ECT: $zD ************�`* , SERVICES*********ON"�h p 501 491 <br /> ********* SIll_ * ***********IN�,D ,TION 0 <br /> **** *** <br /> DEPP.R' 'NT <br /> oR ********NT�S�*** QQ <br /> Hi; ATTACHMENT(S) : <br /> .TTACHME �� ��Z~��o� <br /> BID TABULATION ONE NUMBERS: EILLSBORO UGH 73a-9361 <br /> Venn pH HILLSBORO <br /> Cr <br /> CH <br /> APEL HILL 2 _ <br /> PO � MEBANE 27-2031 <br /> D ur D 688-7331 <br /> ***************** **** * k**iiiik**i *fi * i � d � ******i *ii *i *i * tiie** <br /> e* <br /> and Denbo► . Inc. to <br /> awarding a bid to Crain at Or <br /> Lake in <br /> To consider system <br /> PURPOSE: flashboard (spillway) <br /> Croy construct a <br /> Rt. • Hillsborough. <br /> Morri <br /> nt to Board action, which recommended that Oran <br /> BACKGROUND: Pursuant one foot, bids were solicited ted from <br /> cok be raised by one the spillway y <br /> contt ractors to <br /> accomplish this g oal. 11, brought forth only <br /> opening date, May G.S. equir y <br /> Two first bid P bid <br /> or two bids. For construction re bids or repair <br /> resolicitedattand a with <br /> 9e three bids, therefore tabulation is <br /> Box � date of May 20 was set. A <br /> rham, 20 opening. <br /> results of the May <br /> Funds are available to support the $21,978 expenditure <br /> -X 240 F this project will require. <br /> lotte0 <br /> RECOMMENDATI ON: Award bid to Crain and Denbo, Inc. , Durham to <br /> construct a spillway system at Orange Lake, for a <br /> sum of $21,978. <br />