Browse
Search
Agenda - 06-01-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 06-01-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2016 8:22:24 AM
Creation date
9/29/2016 1:44:27 PM
Metadata
Fields
Template:
BOCC
Date
6/1/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> 6. Construction manual. Grantee shall provide its <br /> construction crews and any contract construction company with a <br /> construction manual detailing each stage of the construction <br /> process. A copy of this construction manual shall be provided to <br /> the county manager before construction commences. Any comments <br /> and recommendations made by the county manager concerning this <br /> manual shall be considered by grantee and if necessary to meet <br /> the requirements of the franchise or the ordinance, the manual <br /> shall be revised by the grantee . All installations shall be <br /> supervised and inspected by grantee' s engineers. <br /> C. Channel capacity and system design . Grantee shall <br /> install and maintain a "state-of-the-art" system and abide by all <br /> reasonable requests of the county to upgrade the system. Without <br /> limiting the generality of this requirement: <br /> 1. All new construction of plant in the <br /> unincorporated areas of the county shall be 400 MhZ capable and <br /> be two-way capable. <br /> 2. Grantee shall operate its existing plant in <br /> the county and all new plant in the county to 300 MhZ, 35-channel <br /> capacity. <br /> 3. Grantee shall provide a trouble feed-back <br /> system which allows the monitoring of all active elements of all <br /> Main Trunk Cable of the system. <br /> 4 . Within three years of acceptance of this <br /> franchise grantee shall have completed all work necessary to <br /> upgrade its entire system within the unincorporated areas of the <br /> county and shall have activated its entire system to 400 MhZ , 54- <br />
The URL can be used to link to this page
Your browser does not support the video tag.