Browse
Search
Agenda - 06-01-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 06-01-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2016 8:22:24 AM
Creation date
9/29/2016 1:44:27 PM
Metadata
Fields
Template:
BOCC
Date
6/1/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AAT�CLE SPECIFIC <br /> FIC STANDARDS1AL'L SPECIAL USES { 'Yes" Indicates compliance-' "No" Indicates noncompliance) <br /> Planning Staff <br /> Ordinance R cquirements Findings Eyldence 'SubmItted To Support Findings Planning Board FI ding_s <br /> Article 8.2 .4 requires the applicant <br /> to address the following: <br /> a) Method and adequacy of provision Yes ' X No Water b sanitary sewer plan shows Yes No <br /> for sewage disposal facilities, proposed method. " Adequacy detbrmination <br /> solid waste and water service subject to approval of water supply and <br /> sewage disposal plans by the N.C. Division <br /> of Health Services and Division of Environmental <br /> Management, respectively. Use of low-pressure <br /> community disposal system consistent with <br /> existing Land .Us'e' Plan policy -to allow such <br /> systeYns in areas designated Transition and Rural <br /> Resident ial I. <br /> Private trash collection system proposed with <br /> b) Method and adequacy of. police, Yes No use of individual receptacles. <br /> fire and rescue squad protec- Letters from public service agencies Yes No <br /> tion <br /> have been provided. All agencies have <br /> indicated their ability to serve the <br /> project. <br /> C) Method and adequacy of vehicle " ' X Yet ' ' No 0ro,jected traffic volumes generated by Yes No <br /> access to the site and traffic the project estimated by the Staff to <br /> conditions around the site be 120 trips per day (25 units 4.78 trips/unit) . <br /> Accvess to the site is through-an existing <br /> mobile home- park in the same ownership. <br />
The URL can be used to link to this page
Your browser does not support the video tag.