Browse
Search
Agenda - 05-19-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 05-19-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 4:19:00 PM
Creation date
9/29/2016 11:56:32 AM
Metadata
Fields
Template:
BOCC
Date
5/19/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 8"i CHANDLER CONCRETE CO., INC. <br /> READY MIXED CONCRETE <br /> POST OFFICE DRAWER 1239 <br /> BURLINGTON. NORTH CAROLINA 27216-1239 i <br /> (919) 226-1181 D E C E FIVE D <br /> May 11, 1987 <br /> Mr. Greg Szymik <br /> Orange County Planning Department <br /> Hillsborough, North Carolina 27278 <br /> Dear Mr. Szymik: <br /> On May 5, 1987 you informed Ms. Joyce Garrett as attorney <br /> for Chandler Concrete Company that the Board of Commissioners had <br /> scheduled a Special Public Hearing to be held on June 1 to <br /> consider an application for a PDI-III for the property adjoining <br /> the present Chandler Concrete Plant. <br /> Upon learning of your conversation with Ms. Garrett I <br /> immediately contacted you. The purpose of this letter is to <br /> confirm my discussion with you. <br /> As you are aware, I met with Mr. Jeffrey Gladhill and Mr. <br /> Marvin Collins after learning that the Orange County Courts had <br /> ruled that the Special Use Permit issued to Chandler Concrete was <br /> invalid. Since that time, I have made diligent efforts to <br /> evaluate the course of action to be taken by Chandler Concrete so <br /> as to best accommodate the needs of both Chandler Concrete and the <br /> community. <br /> One primary need of Chandler Concrete is the prevention of <br /> water run-off into an adjoining stream and the implementation of <br /> a reclamation operation. I have had extensive discussions with <br /> the North Carolina Environment Department and with Mr. Allen <br /> Jackson of J & H Equipment, Inc. concerning the most appropriate <br /> methods for environmental control and reclamation. One goal <br /> which we wish to accomplish is to have an efficient method of. <br /> operation which will not have an undesirable effect in the <br /> community. Mr. Jackson has now recommended a specific piece of <br /> equipment. This past week I visited a job site and observed the <br /> equipment. This is the first job site to have the recommended <br /> equipment in operation and I wished to be assured of its <br /> performance during actual operation. <br /> From our past experience I am fully aware that the Board of <br /> Commissioners wishes to have as many details on the specifics of <br /> the Chandler Concrete operation as can be provided. Managing the <br /> environmental matter and reclamation are important aspects to <br /> Chandler Concrete ' s renewed application for a Special Use Permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.