171 - <br /> PHILIP POST <br /> Er ASSOCIATES <br /> ENGINEERS/PLANNERS/SURVEYORS <br /> Mr. Marvin Collins <br /> 30 January 1967 <br /> Page Two <br /> On March 3, 1986 we submitted all <br /> Morton. Larry had Just replaced Billy Timberlake to Larry <br /> Durham office in January 1986. Timberlake who left the <br /> and we did not receive any Larry was subsequently replaced <br /> 1986. y NCDOT review comments until July 2. <br /> We received final NCDOT plan approval on August 5, 1986. <br /> Meanwhile, the erosion control <br /> permit was issued on April <br /> 23, 1986 and work on <br /> the site began immeda'at . <br /> The following is the approximate construction schedule <br /> amounts expended: Jule and <br /> Date Date <br /> tem <br /> Sted art APProx. <br /> • <br /> 1 . ed Cam feted Cost Naffs <br /> Street & Erosion 11/85 <br /> Plans 3/86 $4.600 <br /> 2. Clearing <br /> 3. Erosion Control `1/86 5/86 x8.000 1 <br /> 4. Grading 5/86 5/86 X2,300 <br /> 5. Storm Pipes 7/86 9/86 1 <br /> 8/86 000, <br /> 5 6 <br /> 6. Seeding 8/86 OQQ 1 <br /> 7. Fine Grading 9/86 9/86 0 ..200 <br /> 8. Base 11/86 11/86 $ <br /> Begin 12/86 Stopped 10,000 2 <br /> Peed by 820,00Q 2 <br /> 9. Paving Not Started NCDOT <br /> 10. Atty Fees, Permits, _22,000 2 <br /> . etc - e2.300 <br /> TOTAL: <br /> s82. 1QQ <br /> Notes: <br /> 1 . Chuck Sneed, Bill Sneed's son, did for clearing, erosion control and storm pipe.e. They �os the labor <br /> reflect costs for hired labor, �Pe- The costs shown <br /> they do not reflect any •.w • equipment rented. gas, etc. and <br /> value of not <br /> items n ages.. far Chuck Sneed. The actual <br /> higher than the stated amounts. <br /> • <br />