Browse
Search
Agenda - 05-04-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 05-04-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 4:16:18 PM
Creation date
9/29/2016 11:32:21 AM
Metadata
Fields
Template:
BOCC
Date
5/4/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Central Telephone Company A t t c3 C h ii1 @ t1 t B <br /> North Carolina <br /> 141 <br /> REC'El JAN 1 1987 <br /> 0entel Company CENTEL <br /> 120 Fourth Street,S.W. <br /> 1 <br /> P.O.Box 2308 <br /> Hickory,NC 28603.2308 <br /> Telephone 704 325 0101 <br /> January 13, 1987 <br /> Ken Thompson <br /> Orange County Offices <br /> 105 E. Margaret Lane <br /> Hillsborough, NC <br /> Dear Mr. Thompson: <br /> In reference to Tony Mason of CHR Associates request <br /> the relocation of the Rolm CBX serving the Orange County Offices, thiscrelocation for <br /> would involve the following: <br /> 1. Relocate the Rolm CBX from the Graddy Brown complex. A budgetary price on <br /> this would be $12,000.00. <br /> 2. All local lines, FX numbers and OPX lines would have to be reterminated to the <br /> new location. There would be a retermination and service order charge for this. <br /> I do not have these rates, they would have to come from the Business Office <br /> after a complete inventory of the existing lines and OPX's was made. i would <br /> expect this would be about $3,500. <br /> 3. The County would have to provide a suitable Equipent <br /> This would be 120 Sq. Ft. minimum with air conditioning oc pacityetogcool112,000 <br /> BTU from the switch. This must be on a separate system which is not turned off <br /> nights and weekends. <br /> These are budgetary prices only. This would have to be done on a Time and Material <br /> basis. The labor rate would be $40.00 per hour regular and $60.00 <br /> I estimate about 25% of premimum time (after hours/wef the work would be p/weekeeks time. <br /> The switch would be down about 8 hours. nds) . <br /> Please give me a call if I can be of further assistance in this matter. <br /> Sincrely, <br /> 241 <br /> rY E. Bell <br /> Engineer I - Sales <br /> LB:tc <br /> cc: Bill Hall <br /> File <br />
The URL can be used to link to this page
Your browser does not support the video tag.