Orange County NC Website
131 <br /> Three Change Orders for Mebane Heating and Air Conditioning <br /> Change Order Number Three <br /> Item One <br /> Install three return air grilles where marquee was removed and a <br /> new ceiling was installed. Grilles were omitted from plans and <br /> specifications. cost of installing three grilles - $125.00. <br /> Change Order Number Two <br /> Item One <br /> During demolition the two existing units were suspended to the <br /> roof and causing damage to refridgent line and outside housing <br /> of the units. The units were sitting on the ceiling of the <br /> (meat department) . They had to be supported by metal beams. <br /> Cost of $300. 00. <br /> Change Order Number One <br /> Item One <br /> Move location of existing thermostats to control heating and <br /> cooling after fire corridor was added. They were located in <br /> open space prior to renovation and this was omitted from plans <br /> and specifications. Cost of $200.00. <br /> Item Two <br /> Extend duct across hallway to get return air back to air <br /> handler. There was no return in that office space. Extension <br /> of duct and grille omitted from plans and specifications. Cost <br /> of this work $550. 00. <br />