1 ! Attachment A <br /> SUMMARY OF CHANGE ORDERS FOR THE CARR BUILDING RENOVATION <br /> There are four Change Orders for D.W. Ward Construction <br /> Company. <br /> Change Order Number One <br /> Item One <br /> Reduce thickness of metal roof on the front from 20 gage to 26 <br /> gage since the asphalt shingles were on a solid surface. A <br /> credit of $7,995. 00 to Orange County. <br /> Item Two <br /> Remove a section of Terrazzo floor topping which would have been <br /> in the corridor. This was necessary to make the corridor level <br /> for the floor tile installation. Cost of this item $334.00. <br /> Change Order Number Two <br /> Item One <br /> The drywall ceiling was attached to the partition walls of an <br /> office which was to be removed. The removal required some <br /> patching of the ceiling where the new accoustical ceiling would <br /> be installed. Cost - $183. 00. <br /> Item Two <br /> This new accoustical ceiling was to replace the ceiling in item <br /> one. Cost for this was $121.00. <br /> Item Three <br /> Due to termite damage in the furring strips and baseboard as <br /> well as the paneling all was removed and the owner paid to have <br /> the building treated. The damaged wood was found when the <br /> office demolition was done. The cost of this item $784.00. <br /> Item Four <br /> The decision to try to clean the old carpet in the plumbing <br /> store was made before the job went out for bids. The carpet <br /> could not be cleaned and there were holes in the floor which <br /> needed to be filled. There were stains and holes and excessive <br /> ware in the existing carpet. Cost for removal and patching <br /> floor $349.00. <br /> Item Five <br /> Install new carpet through out plumbing store where the old <br /> carpet was removed. Cost 2963.00. <br />