Orange County NC Website
EDC Preliminary Study — Page 4 <br /> 4. What data must be assembled by the major study to make <br /> the economic development plan realistic, effective and <br /> operational? <br /> 5. What is a suggested timetable for conducting the major <br /> study? <br /> S. What is the likely cost for the major study? <br /> 7. What firms or individuals should be included in the <br /> List of potential contractors for undertaking the <br /> major study? <br />