Browse
Search
Agenda - 04-21-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 04-21-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 4:12:18 PM
Creation date
9/29/2016 11:07:44 AM
Metadata
Fields
Template:
BOCC
Date
4/21/1987
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Pam Jones Homestead Center Proposal page 3 <br /> It is assumed that the existing well and waste �) <br /> disposal systems are in workable condition. ._ 71 <br /> A new heating system with ductwork in the <br /> attic shall be designed for the building, with <br /> ducts sized to accomodate future A/C. <br /> Electrical system shall be upgraded to meet code <br /> and use requirements, including heating system <br /> demands. Exterior security lighting shall also <br /> be considered. <br /> PROJECT BUDGET/ ARCHITECT'S FEES: <br /> We understand that the Total Amount budgeted <br /> for the Project is $ 70,000.00 Architect's <br /> fees for the work outlined above would be <br /> $ 6,363.00, leaving a Construction Budget of <br /> $ 63,637.00. Not included in the Architect's <br /> basic fees are costs of surveying, specialists' <br /> testing of water and waste disposal systems, or <br /> testing of electrical system. <br /> The costs of prints, copies and bid <br /> advertisements are considered reimbursable <br /> expenses and are not included in the basic fees <br /> as standard policy under AIA Contracts. <br /> SCHEDULING: <br /> We are prepared to begin the required design <br /> work right away and to complete the required <br /> construction documents to be ready for bidding <br /> within 45 days from the date of acceptance of <br /> this proposal. <br /> If this proposal is acceptable to you and the Board of <br /> Commissioners, please let us know and we shall prepare <br /> the appropriate agreement documents (AIA B 151 Form). <br /> We are very grateful for the opportunity to submit <br /> this proposal and we look forward to the possibility <br /> of working with you and Orange County on this special <br /> project. <br /> If you have questions about any of the items listed in <br /> this proposal or about the Agreement Form, please let <br /> P po 9 P <br /> us know. <br /> Very tr ly yours, <br /> =i /ter I r'.� <br /> Roman o • •ij AIA <br /> Architect <br /> encl. <br />
The URL can be used to link to this page
Your browser does not support the video tag.