Browse
Search
Agenda - 04-21-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 04-21-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 4:12:18 PM
Creation date
9/29/2016 11:07:44 AM
Metadata
Fields
Template:
BOCC
Date
4/21/1987
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ARTICLE 9 <br /> BASIS OF COMPENSATION <br /> The Owner shall compensate the Architect for the Services provided, in accordance with Article 4, Payments to the <br /> Architect,and the other Terms and Conditions of this Agreement,as follows: <br /> 9.1 AN INITIAL PAYMENT OF six hundred dollars (5 600.00 ) <br /> shall be made upon execution of this Agreement and credited to the Owner's account as follows: <br /> Amount of initial payment shall be credited to the final invoice <br /> for Architectural Services. <br /> 9.2 BASIC COMPENSATION <br /> 91.1 FOR BASIC SERVICES, as described in Paragraphs 1.1 through 1.4 or identified as such in Article 10, Basic Com- <br /> pensation shall be computed as follows: <br /> (Here insert basis of compensation, including fixed amounts,multiples or percentages, and identify Phases to which particular methods of Corm <br /> pensation apply,If necessary.) <br /> Basic services shall be charged at 10% of construction costs, estimated <br /> as follows: <br /> Estimated Construction Budget: $ 63,637.00 <br /> Architect's Fees : 6,363.00 <br /> 9.2.2 Where compensation is based on a Stipulated Sum or Percentage of Construction Cost, payments for Basic Ser- <br /> vices shall be made as provided in Subparagraph 4.2 so that Basic Compensation for each Phase shall equal the <br /> following percentages of the total Compensation payable: <br /> (include any additional phases as appropriate.) <br /> Design Phase: thirty-five percent( %) 35% <br /> •Construction Documents Phase: forty percent( %)40% <br /> Bidding or Negotiation Phase: five percent( %) 5% <br /> Construction Phase: twenty percent( %) 20% <br /> 9.3 FOR ADDITIONAL SERVICES provided under Paragraph 1.5 or identified as such in Article 10, compensation <br /> shall be computed as follows: 1.5 times hourly rates for employees ($18.00/hr) <br /> (Here insert basis of compensation. including rates and/or multiple! Of Direct Per,cnnel Expense for Principals,consultants and employees. Eden• <br /> by specific types of consultants in Article 10,ii reyuired.,pri nei pal at $50.00/hr <br /> 1.2 times invoice for consultants authorized by Owner <br /> 9.4 Payments due the Architect and unpa 1p Llfg4rtAA149411Yal +g§l 7rr ilaritsitCfRim the date payment is due <br /> at the rate entered below, or in the absence thereof, at the legal rate prevailing at the principal place of busi- <br /> ness of the Architect. <br /> (Here insert any rate of interest agreed upon_) <br /> (Usuary laws and requirements under the Federal Truth in Lending Act,similar state and local consumer Credit laws and other regulations at the <br /> Owner's and Architect's principal places or business. the location of the Project and elsewhere may affect the validity of this provision. Specific <br /> legal advice should be obtained with respect to deletion,modification, or other requirements such as written disclosures or waivers.) <br /> 93 The Owner and the Architect agree in accordance with the Terms and Conditions of this Agreement that: <br /> 95.1 IF THE SCOPE of the Project or of the Architect's Services is changed materially,the amounts of compensation <br /> shall be equitably adjusted. <br /> 9.5.2 IF THE SERVICES covered by this Agreement have not been completed within 45 days ( ) months <br /> of the date hereof, through no fault of the Architect, the amounts of compensation, rates and multiples set <br /> forth herein shall be equitably adjusted. <br /> AIA DOCUMENT 0151 • AUREVIATED OWNER-ARCHITECT AGREEMENT • JUNE 1971 EDITION • AIM <br /> tb <br /> 1978• THE AMERICAN INSTITUTE OF ARCHITECTS,1725 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 5151.1978 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.