Orange County NC Website
06i <br /> Ms. Pam Jones <br /> Homestead Building Renovation <br /> March 6, 1987 <br /> Page 2 <br /> • HVAC Ey . ion:. <br /> The heating and cooling system will be surveyed by our <br /> engineer and recommendations will be made for upgrading the <br /> system. This will entail a review of the existing electrical <br /> system to determine adequacy for the renovated building. <br /> • Cost Estimated <br /> The costs projected for the renovation will be outlined and <br /> recommendations made for prioritizing these expenditures. <br /> • ScJ edulgi <br /> The work outlined above can commence within one week of <br /> Notification to Proceed and completed within 30 days of that <br /> date. <br /> • LAIDenatiQD1 <br /> CHR will undertake the work outlined above and produce the <br /> required construction documents and cost estimate for the sum <br /> of $9,750.00. <br /> We very much appreciate the opportunity to do this work for the <br /> County. We were extremely pleased with the final result at the <br /> Carr Building and hope to have opportunity to produce a similar <br /> result for this facility. <br /> We look forward to hearing from you. <br /> Very sincerely, <br /> CHR Associates, . . <br /> .46/1arigOiliteirie <br /> Arthur R. 111111 ,°- , FAIA <br /> President <br /> ARC:mm <br />