Orange County NC Website
Page 7 <br /> I guess one would think that after requesting a new Motor Pool Facility <br /> and a new Administrative Office Building that all the immediate capital <br /> needs for the Public Works Facility would be taken care of; however, <br /> that is not the case. There is a problem with ingress and egress at the <br /> current entrance to the facility from Highway 86. The driveway is <br /> located right below the crest of a hill causing very poor sight <br /> distance, and creating a hazard for anyone attempting to visit or leave <br /> the facility. There is also a need for a more suitable entrance to the <br /> Northern Fairview Park as the current entrance requires that the traffic <br /> go through a residential neighborhood. <br /> There is a vacant lot on the west side of the intersection of Highway 86 <br /> and Highway 57 which would provide a much safer driveway if a traffic <br /> light is installed. <br /> To install the drive it would require that we purchase a 5 acre vacant <br /> lot from a local resident. The entire 5 acres would have to be <br /> purchased as the driveway will consume the majority of the road frontage <br /> of the property. The estimated cost for the 5 acre lot is $50, 000. <br /> The purchase of the 5 acre lot will provide a driveway to Public Works, <br /> however an additional easement or purchase from the Town of Hillsborough <br /> will be required to access the park. The cost of an easement or <br /> purchase of this property is yet to be determined. <br /> I realize the magnitude and impact of the Public Works Capital <br /> Improvement requests in light of shrinking County revenue, however the <br /> Requests addresses pressing needs that will require immediate action to <br /> resolve. The requests do not in my judgment include any frills, but <br /> they do provide us with the facilities to provide the highest level of <br /> service at the least possible cost. I can now only ask that you give <br /> the Capital Improvement Requests due consideration. <br /> FOLLOW-UP STUDY <br /> Consultants from LTK Management Services on contract with The North <br /> Carolina Department of Commerce, Energy Division will conduct an <br /> assessment, energy audit, of the Motor Pool Operation. Areas of <br /> analysis shall include the following: <br /> * Fuel consumption monitoring practices; <br /> * Vehicle and driver mileage performance; <br /> * Vehicles routing and scheduling methods; <br /> * Fleet services area and trip characteristics; <br /> * Preventive maintenance programs; <br /> * Maintenance record keeping practices; <br /> * Vehicle replacement policies; and <br /> * Inventory of fuel efficiency equipment. <br /> The anticipated completion date for the assessment is June 1987. <br />