Orange County NC Website
r <br /> final plat; <br /> (3) The applicant' s engineer shall provide the NCDOT, for <br /> review and approval , an evaluation of the load bearing <br /> capacity of the bridge and shall make whatever improve- <br /> ments are necessary to certify that the bridge meets <br /> NCDOT safety and construction criteria, including: <br /> a) structures which are to span open streams shall be <br /> designed for hydraulic requirements in accordance with <br /> the Division of Highways criteria, and b) structures <br /> shall be designed for a minimum live load HS-20 as <br /> specified in the Standard Specifications for Highway <br /> Bridges of the American Association of Highway Officials, <br /> c) other requirements, as set forth in the Subdivision <br /> Manual May 1 , 1983 shall be followed. <br /> (4) The applicant shall have performed and shall post with <br /> Orange County an annual bridge inspection report. <br /> The Manager further recommends that Orange County' s consulting <br /> engineer be directed by the Manager to conduct a study and <br /> provide recommendations concerning measures to safeguard the <br /> Lake Orange dam structure and spillway, including but not <br /> limited to, fencing to prevent public access. <br />