Orange County NC Website
1 <br /> 5. R' ♦, • r <br /> 6 <br /> Gledhill expressed that a concern he has with a subdivision this <br /> large, with the roads and bridge not built to State Standard, is <br /> keeping them maintained. <br /> Commissioner Halkiotis expressed a concern with the bridge and <br /> with construction equipment going across the bridge. <br /> The developer, George Lattimore, stated that one of the special <br /> design considerations was to limit the number of lots in the <br /> subdivision. There is a recognition that the bridge must be a safe <br /> structure. DOT has indicated that they will not evaluate that bridge. <br /> He offered to secure an evaluation from a private engineer. <br /> Chair Marshall indicated that information must be provided which <br /> indicates that the bridge is safe. It would help to have an engineer's <br /> evaluation of the bridge with a restriction that the plans have to be <br /> approved by DOT. <br /> It was the consensus that the condition of the bridge should be <br /> settled prior to the approval of this Preliminary Plan. <br /> Motion was made by Commissioner Willhoit, seconded by Commissioner <br /> Halkiotis to deny the application. <br /> VOTE: UNANIMOUS. <br /> EQUALIZATION AND REVIEW BOARD COMPENSATION <br /> Motion was made by Commissioner Carey, seconded by Commissioner <br /> Halkiotis to compensate the members of the Equalization and Review <br /> Board at $50. 00 per meeting. <br /> With no further business, Chair Marshall adjourned the meeting. <br /> Shirley E. Marshall, Chair <br /> Beverly A. Blythe, Clerk <br />