Orange County NC Website
149 <br /> DRAFT PBM MINUTES PAGE 6 <br /> The fourth condition was accepted. <br /> VOTE: 8 In favor. <br /> 1 opposed (Hubbard - opposed to development In a <br /> watershed) . <br /> 1 abstained (Yuhasz - due to professional con- <br /> flict of interest) . <br />